480 sqm (face) of green reinforced soil slope being installed for the new factory extension of Scavolini S.p.A., one of Italy’s top kitchen brand. Followed by 1,650sqm (face) reinforced SRW (segmental retaining wall). The SRW wall will have a total length of 290 m and a maximum retained height of approx 12m. Both reinforced geogrid structures will be constructed using Class 7D treated site won material.